UL-listed MV and LV switchgear for data centers — delivered while the incumbents quote 2028. Lower cost. Written delivery guarantees.
Medium-voltage switchgear is quoting 52–80+ weeks industry-wide, with many manufacturer lines sold out through 2028. Every week of that is your energization date slipping.
Dedicated production capacity, standardized lineups engineered for data center loads, and slot reservations that hold your place while your award finalizes.
Three families, all UL-listed, all covered by written delivery guarantees.
5–15 kV class lineups for utility intake, generator paralleling, and campus distribution.
Specs →480 V distribution engineered for 2N and N+1 data hall topologies.
Specs →Direct replacement lineups for end-of-life gear — delivered this fiscal year, not 2028.
Specs →Complete submittal packages, test certs, and CAD/BIM blocks — ready to list as an approved equal.
For engineers →Reserve a production slot while your award finalizes. Win bids on a date nobody else can print.
For contractors →End-of-life gear flagged in your last test report? Replace it on your timeline.
For operators →Incumbent quoted 74 weeks. We delivered in 19 — spec review to energization.
Testing firms, manufacturers' reps, and consultants: paid referral fees on closed business. You flag the need, we deliver, you get paid.